Main Scope: To fabricate and install Sponsons tanks built with Gondola structure incorporated with stern thrusters on either sides of the lift boat.
Timing: Dec 2017 – April 2018 (27/12/2017 –30/04/2018)
Class: BV
Major highlights: Completed within and as per the contract to full satisfaction of owner and BV, without being even a single first aid case reported.
Subsea7, UK contracted Albwardy Damen to fabricate and install Sponsons tanks built with Gondola structure incorporated with stern thrusters on either sides of the lift boat.
Works carried out:
Fabrication and installation of Sponson tank 140 T- Fabrication and installation of Sponson tanks with Gondola structure and new stern thrusters
- Fabrication and installation of Bilge System , extension of all associated pipe line
- Modification of the Main Switch Board by extending the Bus-bars and adding additional breakers, electrical cabling and hook-up of the thrusters including the installation of the VFD to power up the thrusters
- Installation and integration of automation and control connections with the existing system
- Carry out commissioning / functional tests / sea trials to the satisfaction of the owners, the representative from the makers of the thrusters and the Class.